Title: | Reconstruction – efficiency improvement study for the anti-fire protection water reservoir in the forest of the Holy Monastery of Simonos Petra, Athos Peninsula |
Client: | Holy Monastery of Simonos Petra |
Capacity: | Contractor (100%) |
Period: | 10/2010 – 02/2012 |
Objective: | Works planning to improve the functionality of the reservoir: -Sealing the body of the dam and sediment removal that were deposited in its bottom -Pre-reservoir construction for retaining sediments before entering the main reservoir -Construction of a pipeline network to connect the reservoir to the water network of the Monastery. And associated works to improve the characteristics of the existing road network and aesthetically improve the area |
Deliverables: | Technical study Hydraulic calculations annex Bill of quantities – Budget – Rate analysis Technical drawing & maps Workers’ Safety & Health plan |
Services: | Reservoir and surrounding area topographic survey Associated Studies\ tasks: Environmental impact assessment of the project |
Indexes: | Reservoir capacity 12,200m3 585m road network |